|
|
Advanced Chemistry in Basin Modeling to Predict Flow Assurance |
 |
REDUCING COSTS AND RISK IN DEEP WATER DEVELOPMENTS
|
High Risk/High Reward |
Tremendous Up-front Capital Costs |
 |
|
|
Early information of oil properties can help to avoid:
• Drilling of marginal prospects
• Over-design of production facilities
• Costly shut-ins during production |
|
 |
Significant Challenges for Production |
|
Successful transport of produced fluids from wellhead to platform requires “Flow Assurance” |
|
 |
|
 |
|
 |
Early Prediction
• Early prediction of fluid chemistry and physical properties can be essential for management of risk and costs in deepwater fields
• Critical information can be obtained prior to drilling
• Avoid drilling marginal prospects
• Design production facilities to reduce the risk of flow assurance problems
• Minimize the occurences of expensive shut-ins once production begins |